State Government UPS/Genset Upgrade

Located within a secure State Government facility, this project involved upgrading the existing power infrastructure supporting a critical control centre. Cablewise were engaged by Programmed to deliver an end-to-end backup power solution to ensure the site’s continuous operation during any utility failure or maintenance event.

UPS Upgrade
Generator Installation
Critical Power
Simulation Testing

The Challenge

The State Government Agency required an upgrade to its backup power systems to ensure uninterrupted operation of its lifecritical control centre. The existing infrastructure was nearing capacity and lacked the necessary redundancy to support ongoing operations during outages or maintenance.

Approach and Execution

Cablewise secured the project through a competitive tender and worked closely with the design team to engineer and install a comprehensive N+3 redundancy system. This included the integration of four 150kVA UPS units, a 275kVA generator, and static transfer load switches. Significant coordination was required to ensure seamless functionality across multiple power layers, particularly within an operational facility that demanded meticulous planning and execution.

Outcomes

The project was delivered successfully with minimal disruption to the building’s day-to-day operations. The on-site team received high praise from agency staff for their professionalism, attention to detail, and quality workmanship. The upgraded systems now provide robust, reliable power continuity, ensuring the control centre can operate without interruption under any circumstances.

Conclusion

  • Construction of fire-rated and climatecontrolled UPS rooms
  • Installation of four new UPS units
  • Supply and installation of 275kVA generator
  • Installation of communications room and control desk power transfer switches
  • Comprehensive power blackout simulation testing and end-user training

Powering Shell Energy’s Neerabup Outage Facility

Shell Energy, the retail division of global energy leader Royal Dutch Shell, serves millions of customers across Australia, delivering tailored energy solutions for residential and commercial needs. When the time came to refurbish critical infrastructure at their Neerabup Power Station in Perth, Western Australia, the challenge was clear: maintain operational integrity of a live site while enabling major turbine maintenance. Cablewise worked closely with Shell Energy, Siemens, and engineering consultants Stantec to execute a highly specialised solution on time, on budget, and with zero disruption to ongoing operations.

Challenges Faced by Shell Energy

The Neerabup Power Station, a vital asset in Western Australia’s energy grid, houses two gas turbine units that had reached a phase in their lifecycle requiring comprehensive servicing and refurbishment. This necessary maintenance posed a multifaceted challenge:

  • Live Site Constraints: The power station needed to remain operational throughout construction, necessitating strict adherence to safety protocols and non-disruptive execution.
  • Bespoke Infrastructure Requirements: Siemens, the turbine OEM, required a specially designed outage facility to support the refurbishment process, one not previously in place at the site.
  • Complex Electrical Demands: Establishing a temporary facility with high-voltage capabilities, compliant earthing systems, and reliable power distribution was technically demanding and risk-sensitive.
  • Multi-Stakeholder Coordination: Effective collaboration between Shell, Siemens, Cablewise, Stantec, and various subcontractors was essential to keep the project aligned and moving forward.

In essence, Shell Energy faced the task of executing a high-risk, high-precision operation within the confines of a fully functioning power station where safety, continuity, and quality could not be compromised.

 

Objectives

To ensure the success of this critical maintenance project, Shell Energy outlined several key objectives:

  • Design and Construct a Fit-for-Purpose Outage Facility: Tailored to the technical and spatial demands of Siemens’ turbine servicing procedures.

  • Ensure Operational Continuity: Avoid any unplanned disruptions to the power station’s generation capabilities during the entire project.
  • Deliver Within a Tight Schedule and Budget: Maintain control over time and cost parameters without compromising quality or safety.
  • Achieve Full Compliance and Safety Standards: Adhere to all regulatory requirements and high-voltage (HV) site conditions through expert consultation and review.

Solutions Implemented

By bringing Cablewise on board during the early design phase, the project leveraged the combined expertise of multiple specialists from day one. Cablewise, working in tandem with Stantec’s Electrical Consultancy team, took a comprehensive approach. By bringing Cablewise on board during the early design phase, the project leveraged the combined expertise of multiple specialists from day one. Cablewise, working in tandem with Stantec’s Electrical Consultancy team, took a comprehensive approach, starting with early audits and site investigations to foresee challenges and tailor solutions. Stantec then developed custom electrical layouts, ensuring the outage facility’s integration into the existing infrastructure met both performance and safety benchmarks. To manage every phase of implementation, Cablewise deployed an agile project management team, including a Project Manager, Site Manager, Site Supervisor, and multiple electricians.

The facility itself was a sophisticated electrical solution, featuring underground containment and power supply routed from the existing Station Main Switchboard (SMSB) to a new “Outage Facility Switchboard” inside the high-voltage exclusion zone. This main switchboard then supplied a power distribution network of multiple sub-boards, each protected by Sensitive Earth Fault Relays and built outside the exclusion zone using a TT earthing arrangement for optimal safety and compliance. The installation provided general and specialised power solutions, from high-spec lighting (including carpark zones) to power for Siemens’ specialised equipment, supporting all necessary operational requirements. Cablewise also engaged with expert subcontractors, coordinating drilling, excavation, and civil contractors, and bringing in a specialist earthing consultant to validate the installation under HV regulations. The project was completed within three months, made possible by seamless communication and coordination between all stakeholders at every milestone.

Outcomes Achieved

Cablewise successfully met the expectations of Shell Energy and Siemens, and the project was considered a strong success by the end user and consultancy team. The newly constructed facility supported the first turbine refurbishment with no performance issues, providing Siemens with the environment and infrastructure needed for precision work. Critically, the power station remained live and fully operational throughout construction, demonstrating meticulous planning and adherence to safety protocols. The project was delivered on-time and on-budget, completed within the allocated three-month schedule and under the $1M budget, underscoring Cablewise’s efficiency and cost-control acumen. Both Shell Energy and Siemens expressed client satisfaction, recognising the project as a strong success and validating the collaborative approach and technical execution. Furthermore, the works were completed safely with zero recorded incidents, meeting Shell’s high standards for health and safety, and with expert consultancy and robust design, all electrical and earthing systems achieved full HV compliance with regulatory standards for high-voltage operations.

Powering Critical Services: Cablewise’s Integrated Solutions for St John Ambulance

Tasked with a complex building refurbishment and fit-out for St John Ambulance, the primary challenge involved delivering state-of-the-art electrical, communications, and AV solutions within a live and critical operational environment. Cablewise was engaged as a trusted multidisciplinary contractor, for ensuring seamless continuity of essential emergency and health services. Through strategic planning and expert execution, we delivered a comprehensive, high-quality solution that met all objectives and significantly enhanced St John Ambulance’s capabilities.

Challenges Faced by Our Client

Renascent, a leading Australian construction company known for managing complex projects in live, sensitive environments, was tasked with a critical project for St John Ambulance. This undertaking was fundamental to maintaining and enhancing essential emergency and health services across Western Australia. The inherent complexity of the project, combined with St John Ambulance’s vital operational requirements, presented significant challenges.

St John Ambulance’s primary concern was the successful, timely, and budget-compliant delivery of a project directly impacting their life-saving services. Delays or budget overruns could have serious consequences. The challenge was executing extensive construction and fit-out works within an active environment without disrupting critical operations. This demanded strict adherence to timelines, meticulous planning to avoid interruptions, and implementing robust long-term solutions. Renascent sought a trusted partner with a proven track record in multidisciplinary solutions; electrical, lighting, communications, and AV, especially in live operational settings where precision and minimal disruption were paramount. Cablewise was engaged due to our demonstrated ability to meet these demanding criteria.

Objectives

Renascent’s objectives for Cablewise were clear: to seamlessly deliver the project, ensuring clear and consistent communication, maintaining a strong focus on meeting program timelines, staying within budget, and guaranteeing high-quality execution. These objectives were crucial to the success of the entire St John Ambulance project and the continuity of vital health services.

Specifically, Cablewise was expected to:

  • Minimise operational disruption: Execute all works without impeding St John Ambulance’s daily emergency and health service operations through careful scheduling and work zone management.
  • Adhere to a strict 12-month project timeline: Timely completion, including extensive internal demolition and fit-out, was crucial for St John Ambulance’s strategic growth.
  • Maintain budget discipline: Deliver all solutions and installations within the allocated financial resources.
  • Ensure high-quality, integrated solutions: Implement robust and reliable electrical, lighting, communications, and AV systems supporting St John Ambulance’s diverse operational needs.
  • Facilitate clear and consistent communication: Establish transparent channels with Renascent and St John Ambulance, providing regular updates and addressing concerns promptly.
  • Resource effectively: Deploy a skilled team capable of managing complexities, ensuring adequate staffing without compromising safety or quality.

Solutions Implemented

Cablewise approached this challenging project with a comprehensive, integrated solution, leveraging our extensive experience in complex, live environments. Our team, ranging from 6 to 12 personnel on site, included a Project Manager, Site Manager, supervisor, and skilled apprentices, ensuring efficient operations and adaptability. A key aspect of our approach was the careful selection of trusted and reputable vendors to ensure the highest quality and reliability of all installed systems. Our solution encompassed several critical components: we implemented Molex structured cabling systems for a high-speed, future-proof network infrastructure essential for St John Ambulance’s critical data and communication needs, ensuring seamless connectivity across all areas. For the electrical backbone, we installed NRP switchboards, known for their high-quality, durable, and safe distribution solutions, critical for powering St John Ambulance’s diverse operations and the new carpark.

Furthermore, a bespoke Mondoluce lighting solution was designed and installed, creating an efficient and visually impactful environment tailored to each area, from workstations to the museum and café, ensuring energy efficiency and enhanced aesthetics. To ensure safety and regulatory compliance, we integrated Clevertronics lighting for all emergency requirements, providing dependable and compliant solutions vital for a public-facing facility. The project spanned a 12-month duration, beginning with internal demolition, leading to the fit-out of a modern St John Ambulance facility. This included a Museum, Shop, Café, multiple Training Rooms, Meeting Rooms, private Consultation Rooms and large open areas for the St John Ambulance Operational Support Hub. A new carpark with lighting was also constructed to supportSt John Ambulance’s growth. Our ability to deliver these complex solutions while maintaining St John Ambulance’s critical operations highlights our meticulous planning, skilled execution, and proactive communication.

Outcomes Achieved

Cablewise unequivocally accomplished all client objectives, delivering a highly successful project that met Renascent’s stringent requirements for quality, timeline, and budget control. Renascent immediately recognised Cablewise as well-resourced and experienced, allowing for efficient mobilisation and delivery of each project stage with confidence. Despite inherent complexities, Cablewise ensured minimal disruption to St John Ambulance’s critical services, allowing operations to continue uninterrupted, and the entire 12 month project was completed precisely within the stipulated timeframe.

All aspects of the project, including advanced system installations, were completed within budget, demonstrating efficient resource management. The implemented solutions, including Molex cabling, NRP switchboards, Mondoluce lighting, and Clevertronics emergency lighting, met the highest standards, significantly enhancing St John Ambulance’s operational capabilities and long-term sustainability. The new facilities, including the expanded operational support hub and various specialised rooms, have considerably improved St John Ambulance’s capacity to deliver and expand services across Western Australia. This success, coupled with Renascent’s positive assessment, reinforced our reputation as a trusted contractor for complex, multidisciplinary projects. Ultimately, Cablewise delivered a state-of-the-art facility that not only met but exceeded the expectations of both Renascent and St John Ambulance, providing a modern, functional, and highly reliable environment essential for St John Ambulance’s continued mission to serve the community.

Powering the State Health Operations Centre Emergency Response

Opra Projects was contracted to develop the new State Health Operations Centre (SHOC) in Perth, WA. They engaged Cablewise to help complete this project. SHOC is aimed to enhance emergency care access by integrating the WA health system with other emergency services.

Challenges Faced by Our Client

The State Health Operations Centre required a technologically advanced infrastructure within a six-month timeframe and tight budget. This involved a complete fit-out of Level 3 (1600 sqm) and Level 10 (1350 sqm), demanding seamless communication and data flow for 24/7 operations.

Objectives

The updating of the State Health Operations Centre centred some key objectives:

  • Cross-Connect Frame Complexity: Over 1,000 cables required precise organisation. We used structured cable management techniques for seamless installation.
  • System Tie Cables: 500 cables needed alignment. Efficient planning ensured structured alignment, minimising errors.
  • UPS Installation: Close collaboration with vendors ensured timely completion to meet tight timeframes.

Outcomes Achieved

The project successfully delivered state-of-the-art infrastructure, meeting the State Health Operations Centre’s needs. The client expressed satisfaction with the high-quality work and efficient implementation. This project demonstrated the importance of detailed planning and quality execution in complex technical infrastructure projects. Our expertise in structured cabling, fibre optics, electrical systems, and lighting enabled us to overcome challenges and deliver a robust solution. The SHOC fit-out showcases our ability to deliver high-quality technical solutions in demanding environments. By prioritising planning and quality, we provided a reliable infrastructure for critical emergency operations.

 

Outcomes Achieved

  • Lighting: DALI-controlled lighting for energy efficiency and automation.
  • Structured Cabling: Cat6A Siemon cabling for high-speed data transmission, with consolidation points for flexibility.
  • Fibre Optics: Siemon fibre interconnecting floors and workstations, with fibre duct for organised cabling.
  • Cable Management: Cable trays and Iconic Pro outlet plates for organised and protected cabling

Enhancing Broadcast Efficiency for Nova Radio Station

Enhancing Broadcast Efficiency for Nova Radio Station in Perth, WA

Nova Radio Station is a leading broadcaster, offering high-quality audio and visual entertainment to audiences across Perth and beyond. As a premier radio station, Nova is committed to delivering engaging content and maintaining state-of-the-art studio facilities to support its operations

Challenges Faced by the Client:

Nova Radio Station sought to modernize its studio facilities while ensuring that live broadcasts continued uninterrupted. The project required upgrades to key studio components, including new lighting systems and workstations. A specific focus was placed on upgrading one of the station’s operating studios to enhance functionality and aesthetic appeal, enabling seamless video livestreaming of podcasts.

Solution Implemented:

Cablewise approached the project with precision and expertise, leveraging extensive experience in commercial electrical installations and broadcast environments. The solution involved installing modern electrical systems to support advanced lighting technology and implementing an enhanced workstation setup tailored to the needs of radio broadcasting.

To minimize disruptions, the renovation was executed in well-coordinated phases. Cablewise’s technical experts worked closely with Nova’s team to ensure work was scheduled around live broadcasting hours. Custom-designed lighting fixtures and infrastructure enhancements were integrated into the studio, enhancing both visual and operational efficiency. The planning, design, and implementation phases spanned several months to ensure every detail was meticulously executed.

Outcomes Achieved:

The successful implementation of modern electrical and lighting systems transformed Nova Radio Station’s studio into a cutting-edge broadcast environment. The station remained on air throughout the renovation, ensuring uninterrupted content delivery to its audience. Additionally, the upgraded studio now supports enhanced video livestreaming capabilities, allowing for a more dynamic and engaging listener experience. The renovation provided a more professional and flexible workspace, aligning with Nova’s commitment to innovation and high-quality production.

Technical Services Utilized:

  • Modern Electrical Upgrades
  • New Lighting Installations
  • Studio Design Enhancements

By seamlessly integrating innovative solutions with expert craftsmanship, Cablewise delivered a transformative studio fit-out, enhancing Nova Radio Station’s ability to produce high-quality audio and video content in a modern, efficient workspace.

 

 

Credits

Photographer: Daniel Carson-  dcimages.org

Client and Builder- Aurora Project group

 

 

Enhancing Facilities at Ronald McDonald House

Ronald McDonald House (RMHC) on Park provides families with supported accommodation while their loved ones receive care at Perth Children’s Hospital. Nestled amongst tranquil gardens, this facility offers a comforting environment during challenging times. To better serve its visitors, RMHC embarked on a refurbishment project to create new reception and office spaces and enhance dining facilities for families.

Challenges Faced by Our Client

  • Facility Modernisation: Ground floor and Level 1 areas required redesigning to accommodate new reception and office spaces. Level 3, previously the Dean’s apartment, needed to be transformed into a functional dining and servery area.
  • Budget and Design Coordination: The refurbishment needed careful planning and alignment with financial constraints.
  • Enhanced Functionality: The new areas had to meet RMHC’s operational requirements, providing efficiency, comfort, and reliability.
  • Timely Delivery: The facility’s importance meant the project needed completion within a strict timeline to minimize disruption.

Objectives

  • Improved Facilities: Convert underutilized spaces into functional and inviting areas for families, staff, and visitors.
  • Safety and Compliance: Ensure all electrical and data systems met modern safety standards and codes.
  • Enhanced Connectivity: Upgrade data systems to provide seamless access for both staff and visitors.
  • Cost-Effective Solutions: Achieve the project’s goals while staying within budget constraints.

Solution Implemented

Cablewise employed a focused approach to meet RMHC’s goals:

  • Electrical Systems Upgrade: Installed modern infrastructure for the dining and servery area, including load centre upgrades and accessory connections.
  • Data Infrastructure Deployment: Utilized Siemon CAT6A cabling for wireless access points and field outlets, ensuring robust connectivity throughout the refurbished areas.
  • Collaborative Design Support: Partnered with RMHC and Renascent to ensure all technical solutions aligned with operational needs and budgetary goals.
  • Dedicated Project Management: Allocated sufficient labour and resources, ensuring timely project completion with seamless communication and coordination.

Results Achieved

Cablewise successfully met RMHC’s goals, delivering high-quality spaces within the agreed timeline and budget. The upgraded areas provide families with safe, functional, and welcoming environments. Enhanced data infrastructure and compliance with safety standards ensure the facility’s efficiency and reliability. Through a collaborative partnership, RMHC’s mission to offer a “home away from home” was further supported, improving the experience for families during their stay.

 

The Rosemount Hotel, North Perth: Beer Works Fit Out

The Rosemount Hotel, a historic landmark in North Perth, has been a cornerstone of the community since its establishment in the 1920s. During a time of rapid urbanisation, the hotel quickly became a popular gathering place, blending hospitality with a sense of tradition. Over the decades, the Rosemount has managed to preserve its historic charm, serving as a symbol of continuity in a constantly evolving neighbourhood.

Challenges Faced by Our Client

As the hotel neared its 100th anniversary, the client faced significant challenges in maintaining the Rosemount’s relevance in a competitive and rapidly changing hospitality industry. The primary concern was the need to modernise the hotel’s offerings while preserving its historic appeal. To stay competitive, the Rosemount needed to seamlessly integrate modern amenities and services that meet contemporary guest expectations without losing the charm that made it a beloved landmark.

A critical issue was the hotel’s outdated electrical systems and equipment, which were no longer adequate to support its operations effectively. The ageing infrastructure posed safety and efficiency concerns, making it essential to undertake a comprehensive overhaul. The challenge was not only to replace these systems but also to design a modern solution that optimised the hotel’s use of space and resources, aligning with the client’s evolving needs.

Objectives

The modernisation of the Rosemount Hotel centred around three key objectives:

  • Modernisation: Revamp the outdated electrical systems and equipment to meet current technological standards and support the hotel’s operations for the future.
  • Energy Efficiency: Reduce energy consumption to lower operational costs.
  • Sustainability: Create a sustainable operational model by enhancing energy efficiency and reducing the hotel’s carbon footprint, aligning with modern environmental standards.

Solutions Implemented

To transform the Rosemount Hotel into a contemporary yet historically significant venue, several strategic upgrades were made. The outdated electrical systems were replaced with state-of-the-art, energy-efficient alternatives. Advanced lighting systems were installed to enhance both the functionality and aesthetic appeal of the hotel, creating a more inviting atmosphere. The integration of Zen Wired/Wireless DALI control systems provided flexibility in managing lighting and energy use, allowing the hotel to cater to various occasions and patron preferences.

Outcomes Achieved

Cablewise successfully revitalised the Rosemount Hotel’s infrastructure, delivering a modern, energy-efficient, and sustainable electrical system. These improvements not only enhanced operational efficiency but also enriched the overall guest experience. The Rosemount Hotel now stands as a model of how historic landmarks can embrace innovation to thrive in today’s competitive hospitality landscape, preserving its heritage while meeting the demands of the modern era.

Integrating Innovative solutions for PwC in the CBD

Opra Projects is a Perth-based contractor specialising in workplace fit-outs across various, sectors including commercial workplace, health, aged-care, hospitality, and retail.

Price water house Coopers (PwC) is a leading professional services network globally, offering audit and assurance, consulting, and tax services. PwC is renowned as one of the “Big Four” accounting firms.

 Challenges faced by our client:

PwC sought an update to their existing office space in Perth CBD, necessitating new lighting, modification of the Dynalite Lighting Control system, and upgrades to the Siemon Communications Infrastructure. PwC aimed to achieve an energy-efficient, sustainable, and technologically advanced workspace.

 Solution Implemented:

Cablewise tackled the challenge with a meticulous approach, leveraging the expertise of experienced tradesmen and project managers. The solution involved integrating a sophisticated Dynalite lighting control system into the existing infrastructure and implementing Siemon communications cabling to bolster IT systems, backed by a 25-year installation warranty. Cablewise, as a premier delivery partner for high-detail commercial fit-outs in Perth, possessed extensive expertise in intelligent lighting control, communications, and audio-visual systems, along with a team of experienced technician and project managers.

Customised fittings and feature lighting were meticulously installed into the joinery and finishes, adding a touch of sophistication to the workspace. The planning, design, and implementation phases spanned 5 months.

Outcomes Achieved: 

Cablewise successfully achieved all client objectives within the specified timeline and budget. The implementation of energy-efficient and scalable electrical systems not only reduced operational costs but also transformed the office into a modern, sustainable, and conducive working environment, in line with PwC’s commitment to innovation and sustainability.

Technical Services Utilised:

1. Dynalite Lighting Control Systems 

2. Siemon Data Cabling  

By seamlessly integrating innovative solutions with meticulous craftsmanship, Cablewise delivered a transformative electrical fit-out, enhancing PwC’s workspace to meet the demands of a modern, forward-thinking professional services firm.

Enhancing Electrical Infrastructure for Imdex Limited in Balcatta

Imdex

Imdex Limited, a global leader in mining technology, operates a facility in Balcatta, Western Australia. The company specialises in providing drilling fluids and equipment to the minerals exploration and development industry. With a dedication to innovation and operational excellence, Imdex recognized the need to upgrade its electrical infrastructure at the Balcatta facility to ensure safety, efficiency and reliability.

 Challenges faced by our client:

Modernisation: Upgrade outdated electrical systems and equipment to align with modern standards and technology. Implement a rationalised design to best make use of their facilities and serve their evolving needs.

Safety Enhancement: Implement measures to enhance electrical safety for employees and equipment.

Outdated Systems: Ageing electrical systems and equipment were no longer fit for purpose as the client’s needs had changed over time.

 Objectives:

  • Safety Compliance: The existing infrastructure didn’t fully comply with modern safety standards, posing risks to personnel and operations.
  • Energy Consumption: Inefficient electrical systems led to higher energy costs and environmental impact. 
  • Efficiency Improvement: Improve energy efficiency to reduce operational costs and environmental footprint.

 Solution Implemented:

To meet its objectives, Imdex undertook a comprehensive upgrade of its electrical infrastructure at the Balcatta facility, incorporating the following solutions: 

  • Power System Upgrade: Installation of modern power distribution equipment, including, switchgear and RCD circuit breakers across all services to bring personnel protection up to current code compliance.
  • Replacement of Conventional Lighting Fixtures: Energy-efficient LED lighting to reduce energy consumption and improve illumination quality by achieving mandated minimum light levels with minimal nuisance glare.
  • Emergency Backup Systems: Deployment of high capacity fast charge Electric Vehicle (EV) charge stations with the latest energy management capabilities and staff access card control facility.

Outcomes Achieved: 

Ensuring compliance with relevant electrical codes, standards, and regulations to meet safety requirements and minimise risks. 

By upgrading its electrical infrastructure at the Balcatta facility, Imdex demonstrated its commitment to safety, efficiency, and sustainability. The project’s success not only improved operational performance but also strengthened Imdex’s position as a leader in the global mining technology industry.

 

Innovative Integration for Barbagallo Maserati

precision-engineered lighting control system for Maserati dealership Perth

We were engaged to collaborate with Giorgi Architects & Builders to develop a sophisticated infrastructure, including a high-end structured cabling system, electrical and electric vehicle (EV) charging solutions, as well as a precision-engineered lighting control system tailored to meet the stringent project requirements.

The Challenge:

Deliver a fully compliant electrical & communications system that adheres to international Maserati specifications: This task was particularly challenging due to the bespoke nature of the lighting fixtures, which had to seamlessly integrate with the architectural finishes. The lighting control system faced substantial demands with multiple time-scheduled lighting scenes required across various sales experience areas. The control system also adjusted seasonally and daily to circadian rhythms by implementing dynamic tuneable white light fixtures. Furthermore, to accommodate the rapidly evolving EV vehicle market, multiple charging units and future capacity had to be integrated. Premium structured cabling communication systems supported the audio-visual systems. All these elements had to be delivered within a strict timeline to meet Barbagallo’s business needs.

 

Our approach and solution:

Seamless collaboration with the Giorgi team: Our project team provided invaluable initial design advice and support, working in harmony with the Giorgi team. By practicing our trademark effective communication and a proactive approach to problem-solving, we overcame numerous technical and executional challenges. This ensured the smooth installation of all systems, meeting the construction schedule without delays or reworks, resulting in a flawless delivery.

 

The Benefits:

  • On-time and on-budget project completion: The project was successfully completed within the specified period and budget.
  • Exceptional lighting integration: The lighting fixtures seamlessly integrated with the architectural finishes, enhancing the aesthetics of the space while meeting international Maserati specifications.
  • Adaptive lighting control: The dynamic tuneable white light fixtures adjusted seasonally and daily to circadian rhythms, promoting well-being, and enhancing the sales experience.
  • EV readiness: The integration of multiple EV charging units and future capacity ensures that Barbagallo is well-prepared for the evolving EV vehicle market.
  • Premium structured cabling: The advanced communication systems support high-quality audio-visual systems, contributing to an innovative showroom.

 

Technical Services Provided:

  • Communications cabling deployed: CommScope Cat6A F/UTP
  • Lighting control system deployed: Clipsal CBUS with automation controller unit and custom scripting.
  • Clipsal Saturn Zen outlets
  • Schneider EV Charging Units
  • CMS Rhino trafficable floor boxes

 

Outcomes

The successful completion of the Barbagallo Maserati project stands as a testament to our commitment to excellence in delivering complex and innovative infrastructure solutions. Collaborating seamlessly with Giorgi Architects & Builders, we overcame technical challenges and delivered a fully compliant electrical and communications system that met international Maserati specifications.

 

Not only did we meet the project’s strict timeline and budget, but our innovative lighting solutions, adaptive lighting control, and EV readiness have also set new standards for the automotive showroom industry. We take pride in the exceptional results achieved, with our lighting installation being recognised by Zumtobel Group as an Australian first.

This project demonstrates our dedication to solving intricate challenges, enhancing aesthetics, and meeting the evolving needs of our clients. We look forward to continuing our commitment to excellence in future endeavours.